It recently came to our attention that the Department of Transport and Planning (DTP) had lodged a request for tender for the Fairhaven landslip slope remediation on the Buying for Victoria website. This development came as a surprise to us as the Surf Coast Shire website currently advises that the DTP would share information on these works as soon as it became available.
The shire has since confirmed that construction documents relating to bulk earthworks and drainage works had been put out to tender by DTP but did not include landscaping plans. They also advised that these plans would be shared with AIDA and the local community for discussion prior to their finalisation.
Our ongoing concerns with the remediation works are twofold:
- The overall shape of the embankment and the height, material and appearance of the retaining
- The management of sediment runoff from the works into the Painkalac
We requested and were provided with a copy of the civil engineering construction drawings which we have subsequently reviewed. Whilst the overall appearance of the embankment and retaining wall will remain the same, much will have changed below the surface. The extent of existing soil and subsoil removal is quite significant as is the extent of stepped benching, drainage blanket, select fill and topsoil replacement. We trust that this rigorous approach will solve the current stability problems.
We have drawn to the shire’s attention that under the construction documents the contractor is responsible for the management of surface water during works undertaken on site including temporary surface water diversion from the excavation. We have asked that the contractor be required to stop the runoff of sediment from the site into the Painkalac Estuary as is currently the case. We have also drawn the shire’s attention to the recommendation contained in the tender documents that the construction works be carried out during the drier months (January to April) to reduce slope (in)stability. We trust that they will reschedule these works accordingly.
We look forward to being better informed on progress with this important project in future.
Ian Laging